skip to main | skip to sidebar

Bronze Bar

Wednesday, April 8, 2009

Posted by david tonnesen at 9:40 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

counter

Blog Archive

  • ▼  2009 (35)
    • ►  December (2)
    • ►  November (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (5)
    • ►  May (7)
    • ▼  April (18)
      • Bar top fits bar base. There will be 6 leveling fe...
      • Base nearly finished
      • Legs sprouting
      • A look at the base upside down and with no legs yet.
      • Bending the legs for the bar
      • hammered copper sink option
      • tested bar top cleaner
      • LED controller, remote and power supply
      • possible faucets
      • brushed bronze finish with slight wavy pattern
      • frosted finish
      • The First of many rounds of sanding
      • A peek at the undercarriage
      • Bronze top is welded to frame and holes piloted to...
      • More tubing stiffeners are added
      • Bridge-strut frame
      • No title
      • welding the 1-inch edge around the bar top